Temporary Works

Propping Towers to Support a Crane – Wollongong

The Project

Shore Hire designed and built a modular propping tower system to temporarily support a 500-tonne crane in Wollongong while repairs were carried out on its support legs.

 

Shore 400 propping tower for crane

Summary

Shore Hire's rigging and erection team used the Shore 400 modular propping system to construct a frame exceeding 10 metres in height, capable of bearing the full weight of the crane. The Shore 400 system's versatility allowed the team to customise the structure quickly using a mobile crane and boom lift, saving the client thousands in structural steel costs compared to a fabricated fixed structure and getting the crane back operational significantly faster.

Challenge

Shore Hire were called upon by a structural engineering firm to design a propping solution to support a 500 tonne crane and having already explored a few methods themselves the firm engaged Shore Hire as they knew they needed to come up with an innovative solution.

The problem here was that the crane needed repairs to its support legs, but it was too heavy to simply lift off the ground. Shore Hire needed to find a way to temporarily prop and hold up the entire weight of the crane while the repairs were being carried out.

Shore 400 propping tower for crane

Solution

To solve this problem, Shore Hire recommended the Shore 400 system. This modular and versatile system was ideal for the scenario because it could be easily customized to fit the specific needs of the project without the cost, difficulty, and time frame associated with a fabricated and fixed structure.

Using the Shore 400 system, Shore Hire’s rigging and erection team were able to build a frame to hold up the entire weight of the crane. They were able to assemble the structure quickly and efficiently with the help of a mobile crane and boom lift.

The result was a win for the client, as they were able to get the crane operational again more quickly and far more cost-effectively than would have been possible with a different solution. The Shore 400 system’s versatility and ease of assembly played a critical role in the success of the project. Overall, this project demonstrates the value of innovative thinking and the importance of finding the right solution for even the most challenging problems.